Research Article

Effect of Dynamic Imbibition on the Development of Ultralow Permeability Reservoir

Table 5

Comparison of oil production and water cut before and after dynamic imbibition.

WellWater cut (%)Daily oil production (t/d)Cumulative oil production (t)
BeforeAfterBeforeAfter

A5338.318.41.723.7258
A1204612.22.23.6753
A8144.924.70.970.9658
A6838.5263.04362
A2414733.51.231.31314
Average42.9422.961.832.53109