Research Article
Case Studies of Comprehensive Gas Control Method during Fully Mechanized Caving of Low-Permeability Ultrathick Coal Seams
Figure 12
Gas drainage in roof caving and fissure zones of the No. (9-15)06 panel. (a) Overburden structure of (9-15)06 panel and roof high-level gas drainage boreholes. (b) Boreholes in high drilling site. (c) Metering installation of gas drainage.
(a) |
(b) |
(c) |