Numerical Simulation of Soil Displacement and Settlement in Deep Foundation Pit Excavations Near Water
Table 1
Sequence of construction for the Yellow River Tunnel.
| Construction procedure | Construction content | Job content |
| 1 | First-order precipitation | Water level dropped to 88.0 m | 2 | First-stage excavation | Earthwork was excavated to 89.5 m | 3 | First horizontal brace | Perform the first bar at 90.9 m | 4 | Second | Water level dropped to 83.0 m | 5 | Second | Earthwork was excavated to 84.6 m | 6 | Second horizontal brace | Make the first bar at 85.4 | 7 | Third-order precipitation | Water level dropped to 77.2 m | 8 | Third-stage excavation | Earthwork was excavated to 78.7 m | 9 | Third horizontal brace | Make the first bar at 80.7 m | 10 | Fourth-stage precipitation | Water level dropped to 72.6 m | 11 | Fourth order | Earthwork was excavated to 73.4 m | 12 | Fourth horizontal brace | Make the first bar at 75.6 m | 13 | Fifth-level precipitation | Water level dropped to 70.0 m | 14 | Fifth-stage excavation | Earthwork was excavated to 71.0 m |
|
|