Research Article
Study on Stability of Tunnel Surrounding Rock and Precipitation Disaster Mitigation in Flowing Sand Body
Figure 12
The implementation of advanced conduit and plywood installation.
| (a) Advance small catheter implementation |
| (b) Plywood installation |