Research Article
Study on Stability of Tunnel Surrounding Rock and Precipitation Disaster Mitigation in Flowing Sand Body
Figure 12
The implementation of advanced conduit and plywood installation.
(a) Advance small catheter implementation |
(b) Plywood installation |