Research Article
Failure Analysis of a Highway Cut Slope with Anti-Slide Piles
Figure 8
Coupled analysis results of the cut slope with the actual construction steps.
| (a) The pore pressure after 1-day rainfall |
| (b) The pore pressure after 3-day rainfall |
| (c) The pore pressure after 5-day rainfall |
| (d) The maximum shear stress increment |