Research Article

Seepage Analysis for Construction, with Applications to Some Projects in Hong Kong

Table 1

Summary of heads/pressures for case 1.

(a) Summary of upstream side(b) Summary of downstream side
Head (m)Depth (m)Average hydraulic gradient Hydraulic pressure (kPa)Head (m)Depth (m)Average hydraulic gradient Hydraulic pressure (kPa)

3300.0000.000000.00
2.751.74520.199210.050.25−0.7548−0.331210.05
2.50.55890.204819.410.5−1.4411−0.347019.41
2.25−0.49510.214627.450.75−1.9951−0.375927.45
2−1.36200.229333.621−2.3620−0.423433.62
1.75−1.99990.250037.501.25−2.4999−0.500037.50
1.625−2.22390.263238.491.272−2.5000−0.508837.72
1.5−2.38210.278738.82
1.45−2.42680.285638.77
1.4−2.46090.293038.61
1.272−2.50000.314237.72