Research Article
Recovery Method and Parameter Optimization of a Pilot Test for Conformance Control Flooding and Thermal Recovery in the Offshore Heavy Oilfield
Figure 4
The schematic diagram of the B6 well group. The blue arrow represents the target study well group, and the gray arrow represents the nonstudy well group around the target one.