Research Article

Recovery Method and Parameter Optimization of a Pilot Test for Conformance Control Flooding and Thermal Recovery in the Offshore Heavy Oilfield

Table 3

The conformance control flooding scheme and effect of B6 well group.

ParameterPolymer concentration (mg/L)Slug size (PV)Interval time of polymer injection (month)The result of schemeComprehensive evaluation index
Accumulative oil increment (104 m3)Production-injection ratioRecovery ratio increment (%)

125000.0690.9182.1121.2241.418
225000.08121.2912.5151.7211.842
330000.06121.0122.1361.3491.499
430000.0891.3542.3841.8061.848