Research Article
Recovery Method and Parameter Optimization of a Pilot Test for Conformance Control Flooding and Thermal Recovery in the Offshore Heavy Oilfield
Table 6
The experiment scheme and its result of B30h well with thermal recovery.
| Parameter | Steam injection velocity (t/d) | Shut-in time (d) | Steam injection temperature (°C) | Cycle time of thermal fluid huff and puff (month) | Steam injection quantity in a cycle (t) | Scheme result | Comprehensive evaluation index | Accumulative oil increment (m3/t) | Production-injection ratio | Recovery increment (%) |
| 5 | 120 | 2 | 260 | 9 | 3500 | 0.772 | 1.582 | 2.163 | 1.506 | 6 | 120 | 3 | 265 | 12 | 4000 | 0.842 | 1.638 | 2.020 | 1.500 | 7 | 120 | 4 | 270 | 15 | 4500 | 0.912 | 1.759 | 2.052 | 1.574 | 8 | 120 | 5 | 275 | 18 | 5000 | 1.052 | 1.913 | 2.104 | 1.690 | … | … | … | … | … | … | … | … | … | … | 17 | 150 | 2 | 275 | 12 | 4500 | 0.797 | 1.744 | 2.151 | 1.564 | 18 | 150 | 3 | 270 | 9 | 5000 | 0.534 | 1.564 | 2.137 | 1.412 | 19 | 150 | 4 | 265 | 18 | 3500 | 1.895 | 2.412 | 2.653 | 2.320 | 20 | 150 | 5 | 260 | 15 | 4000 | 1.263 | 2.165 | 2.526 | 1.985 |
|
|