Research Article
Recovery Method and Parameter Optimization of a Pilot Test for Conformance Control Flooding and Thermal Recovery in the Offshore Heavy Oilfield
Table 9
The experiment scheme and results of the combined operation.
| Scheme | Steam injection velocity (t/d) | Shut-in time (d) | Steam injection quantity in a cycle (t) | Steam injection temperature (°C) | Cycle time of thermal fluid huff and puff (month) | Polymer concentration (mg/L) | Slug size (PV) | Interval time of polymer injection (month) | Production-injection ratio | Scheme result | Comprehensive evaluation index | Accumulative oil increment (104 m3) | Production-injection ratio | Recovery ration increment (%) |
| 21 | 120 | 2 | 3500 | 260 | 9 | 2000 | 0.04 | 6 | 0.8 | 5.632 | 11.153 | 14.558 | 10.448 | 22 | 120 | 2 | 4000 | 265 | 18 | 3500 | 0.08 | 12 | 0.9 | 9.061 | 11.409 | 14.497 | 11.656 | 23 | 120 | 3 | 4500 | 275 | 9 | 2500 | 0.08 | 15 | 1 | 4.638 | 11.583 | 15.427 | 10.549 | 24 | 120 | 3 | 5000 | 270 | 18 | 3000 | 0.04 | 9 | 1.1 | 7.593 | 13.033 | 15.186 | 11.937 | … | … | … | … | … | … | … | … | … | … | … | … | … | … | 49 | 150 | 4 | 3500 | 265 | 9 | 2500 | 0.10 | 12 | 1.1 | 5.757 | 10.953 | 14.961 | 10.557 | 50 | 150 | 4 | 4000 | 260 | 18 | 3000 | 0.06 | 6 | 1 | 9.027 | 11.988 | 14.442 | 11.819 | 51 | 150 | 5 | 4500 | 270 | 9 | 2000 | 0.06 | 9 | 0.9 | 4.436 | 11.527 | 14.743 | 10.235 | 52 | 150 | 5 | 5000 | 275 | 18 | 3500 | 0.10 | 15 | 0.8 | 7.382 | 11.212 | 14.764 | 11.119 |
|
|