Research Article

Recovery Method and Parameter Optimization of a Pilot Test for Conformance Control Flooding and Thermal Recovery in the Offshore Heavy Oilfield

Table 9

The experiment scheme and results of the combined operation.

SchemeSteam injection velocity (t/d)Shut-in time (d)Steam injection quantity in a cycle (t)Steam injection temperature (°C)Cycle time of thermal fluid huff and puff (month)Polymer concentration (mg/L)Slug size (PV)Interval time of polymer injection (month)Production-injection ratioScheme resultComprehensive evaluation index
Accumulative oil increment (104 m3)Production-injection ratioRecovery ration increment (%)

2112023500260920000.0460.85.63211.15314.55810.448
22120240002651835000.08120.99.06111.40914.49711.656
2312034500275925000.081514.63811.58315.42710.549
24120350002701830000.0491.17.59313.03315.18611.937
4915043500265925000.10121.15.75710.95314.96110.557
50150440002601830000.06619.02711.98814.44211.819
5115054500270920000.0690.94.43611.52714.74310.235
52150550002751835000.10150.87.38211.21214.76411.119