Research Article
Plugging and Its Stability Evaluation for the Ore Pass in the Nonempty Condition Based on Controllable Grouting of Cement-Sodium Silicate Grout
Figure 1
The status of the main ore pass.
(a) Layout of shaft and drift near the main ore pass |
(b) Collapse area in -330 m of the main ore pass |