Research Article
Development and Application of an Intelligent Evaluation and Control Platform for Tunnel Smooth Blasting
Table 4
Index values of tunnel smooth blasting before implementation.
| Number of sections for measurement | Overbreak area (m2) | Underbreak area (m2) | Maximum overbreak (m) | Average linear overbreak (m) |
| 1 | 6.01 | 0.00 | 0.71 | 0.32 | 2 | 5.74 | 0.02 | 0.61 | 0.29 | 3 | 5.61 | 0.00 | 0.62 | 0.30 | 4 | 5.39 | 0.00 | 0.60 | 0.29 | 5 | 5.33 | 0.05 | 0.59 | 0.30 |
|
|