Research Article

Three-Dimensional Modelling of Desorbed Gas Volume and Comparison to Gas Production Rate in the Montney Plays, Western Canadian Sedimentary Basin

Table 4

Five wells compared between the log-based estimated desorbed gas volume and gas production history data. From cum 12-44 to cum 35-44 refers to the sum of gas production month. Length refers to the horizontal length used for gas production of well. This length was divided into stages as a given standard, and its average length represents the average stage spacing. AB: Alberta; BC: British Columbia; E3m3: thousand cubic meter.

UWILocationAverage volume of desorbed gas (scf/ton)Cum 12-44 (E3m3)Cum 18-44 (E3m3)Cum 24-44 (E3m3)Cum 30-44 (E3m3)Cum 36-44 (E3m3)Length (m)Average stage spacing (m)Stage countMarks

100110307226W500AB8.4112024.78493.85771.33758.41959.81142.667.217
100142506406W600AB9.2828629.923238.111312.3492523962122.584.925
100030106506W600AB6.957123380.72347.81474.4648.41443.596.215
200C052H094G0800BC10.5613199.512844.910029.361703103.51723.1191.59
202C092G094G0800BC9.1613763.210382.17070.75151.72568.5950.455.917