Research Article
Oil-Based Drilling Fluid Plugging Method for Strengthening Wellbore Stability of Shale Gas
Table 12
Fracture sealing evaluation results of strong plugging drilling fluid.
| System | Leaking bed | Pressure bearing time (min) | Leakage stoppage | Description of plugging of leakage bed | Pressure (MPa) | Accumulated leakage (mL) |
| Formula CN-5 | 400 μm crack block | 3 | 0 | 0 | There was no drilling fluid leakage during the experiment | 3 | 0.5 | 0 | 3 | 1.0 | 0 | 3 | 2.0 | 0 | 3 | 3.0 | 0 | 3 | 4.0 | 0 | 3 | 5.0 | 0 |
|
|