Research Article

Development of Modified Grouting Material and Its Application in Roadway Repair Engineering

Figure 11

Borehole peep.
(a) Before grouting (0.5 m, 1.5 m, and 2.5 m)
(b) After grouting (0.5 m, 1.5 m, and 2.5 m)