Research Article
Status Quo of a CO2-Assisted Steam-Flooding Pilot Test in China
Table 2
Simulated reservoir production performance under different perforation thicknesses.
| Scheme | Effective production time (day) | Cumulative oil production (t) | Cumulative steam injection (m3) | Cumulative steam-oil ratio (m3 (CWE)/t) |
| Perforation 7.2 m | 1364 | 11919.83 | 68250 | 0.175 | Perforation 5.8 m | 1485 | 12468.15 | 74250 | 0.168 | Perforation 4.5 m | 1706 | 13470 | 85500 | 0.158 | Perforation 3.6 m | 2023 | 14162.55 | 101250 | 0.140 | Perforation 2.7 m | 2555 | 15270.45 | 127750 | 0.120 |
|
|