Research Article

Status Quo of a CO2-Assisted Steam-Flooding Pilot Test in China

Table 2

Simulated reservoir production performance under different perforation thicknesses.

SchemeEffective production time (day)Cumulative oil production (t)Cumulative steam injection (m3)Cumulative steam-oil ratio (m3 (CWE)/t)

Perforation 7.2 m136411919.83682500.175
Perforation 5.8 m148512468.15742500.168
Perforation 4.5 m170613470855000.158
Perforation 3.6 m202314162.551012500.140
Perforation 2.7 m255515270.451277500.120