Research Article

Investigation on Dewatering of a Deep Shaft in Strong Permeable Sandy Pebble Strata on the Bank of the Yellow River

Table 3

Comparison of excavation depth and safe water table (m).

Excavation depthSafe water table outside the shaftDrawdown required

10-100
20-100
30-100
31.20 (critical excavation depth)-100
35-16.76.7
40-25.415.4
45.1-34.224.2