Research Article
Analysis of Settlement Induced by Shield Construction of the Metro Passing under Existing Buildings Based on the Finite Difference Method
Figure 11
The plastic zone of tunnel surrounding rock in different stages.
(a) Excavation 174 m |
(b) Excavation 87 m |
(c) Excavation 30 m |