Research Article

Analysis of Settlement Induced by Shield Construction of the Metro Passing under Existing Buildings Based on the Finite Difference Method

Figure 3

Settlement of the buildings of Sendadi Garden District: (a) building #11, (b) building #12, (c) building #7, (d) building #6, (e) building #5, (f) building #4, and (g) building #3.
(a)
(b)
(c)
(d)
(e)
(f)
(g)