Research Article

Analysis of Settlement Induced by Shield Construction of the Metro Passing under Existing Buildings Based on the Finite Difference Method

Figure 8

Contours of pore pressure distribution when excavated to 87 m (unit: Pa).
(a) Cross-section not yet lined
(b) Cross-section already lined
(c) Longitudinal section