Research Article
Analysis of Settlement Induced by Shield Construction of the Metro Passing under Existing Buildings Based on the Finite Difference Method
Figure 8
Contours of pore pressure distribution when excavated to 87 m (unit: Pa).
(a) Cross-section not yet lined |
(b) Cross-section already lined |
(c) Longitudinal section |