Research Article
Analysis of Settlement Induced by Shield Construction of the Metro Passing under Existing Buildings Based on the Finite Difference Method
Figure 9
Tunnel vertical displacement contour at different shield tunneling stages (unit: m).
(a) Excavation 30 m |
(b) Excavation 87 m |
(c) Excavation 174 m |