Research Article

Analysis of Settlement Induced by Shield Construction of the Metro Passing under Existing Buildings Based on the Finite Difference Method

Figure 9

Tunnel vertical displacement contour at different shield tunneling stages (unit: m).
(a) Excavation 30 m
(b) Excavation 87 m
(c) Excavation 174 m