Research Article

Temperature Field of Artificially Frozen Gravel Formation and Optimization of Freezing Pipe Layout Parameters under Seepage Flow

Table 2

Merged time and thickness of frozen wall in the physical modeling.

Frozen wallSeepage flow rate (m/d)
01.252.503.755.00

Merged time (h)9.1712.6716.8321.1729.33
Upstream thickness (mm)52362513āˆ’
Downstream thickness (mm)5157616672
Total thickness (mm)10393867972