Research Article

Determination of Reasonable Width of Filling Body for Gob-Side Entry Retaining in Mining Face with Large Cutting Height

Figure 3

Main top lateral fracture structure.
(a) The main roof fracture is above the solid coal body
(b) The main roof fracture is above the roadway
(c) The main roof fracture is located outside the filling body