Research Article
Ultra-High-Pressure Hydraulic Slitting Pressure Relief and Penetration Enhancement Technology and Equipment for Soft Coal Seams
Table 5
Comparison of the amount of work between slotted drilling and comparative drilling.
| | Contrast hole | Slotted hole | Contrast value |
| Drilling arrangement parameters | Row spacing 3 m, normal spacing 4 m | Row spacing 4 m, normal spacing 5 m | 46% reduction in drilling work in the same area | Average 100-meter-per-hole extraction scalar volume within 6 months | 0.056 m3/min | 0.169 m3/min | 3.02 times | The total amount of gas extraction in the same area has increased | ~ | ~ | 71.6% | Effective radius of drilling for 6 months of drilling (m) | 4.76 | 2.69 | 1.76 times |
|
|