Ultra-High-Pressure Hydraulic Slitting Pressure Relief and Penetration Enhancement Technology and Equipment for Soft Coal Seams

Table 5

Comparison of the amount of work between slotted drilling and comparative drilling.

Contrast holeSlotted holeContrast value

Drilling arrangement parametersRow spacing 3 m, normal spacing 4 mRow spacing 4 m, normal spacing 5 m46% reduction in drilling work in the same area
Average 100-meter-per-hole extraction scalar volume within 6 months0.056 m3/min0.169 m3/min3.02 times
The total amount of gas extraction in the same area has increased~~71.6%
Effective radius of drilling for 6 months of drilling (m)4.762.691.76 times