Research Article

Simulation Analysis of Coupled Structural Vibration of Highway Railway Combined Bridge Induced by Overlapping Action of Vehicle and Train

Table 1

Peak value of dynamic response of different nodes under different working conditions.

Vehicle spacingCondition 1Condition 2Condition 3Condition 4Condition 5Maximum

Railway bridge deck1Peak of displacement0.06610.12240.11810.11680.06190.1224
Peak of speed0.05210.10110.10390.11530.05730.1153
Peak of acceleration1.62842.85812.86342.86891.63372.8689
3Peak of displacement0.07550.14230.13360.13050.06730.1423
Peak of speed0.03940.07720.06820.07260.03990.0772
Peak of acceleration1.44352.40932.40932.46051.43872.4605
5Peak of displacement0.07390.13940.18730.24360.12180.2436
Peak of speed0.03710.06800.08470.10810.05390.1081
Peak of acceleration1.52492.62342.97193.77101.85733.771
Highway pavement7Peak of displacement0.06600.12240.11800.11670.06180.1224
Peak of speed0.05220.10130.10350.11570.05740.1157
Peak of acceleration2.38483.99803.98493.97642.35433.998
9Peak of displacement0.07550.14220.13350.13050.06730.1422
Peak of speed0.03920.07680.06650.07090.03870.0768
Peak of acceleration1.62802.73712.86502.97711.75592.9771
11Peak of displacement0.07400.13940.18730.24360.12180.2436
Peak of speed0.03770.06730.08310.10630.05280.1063
Peak of acceleration1.56052.62112.86463.50761.79013.5076
Peak value of reaction force at the bottom of pier 2 (kN)1004.482008.471966.331933.15966.6232008.47
Peak value of reaction force of 4611 node (kN)2.4125.04310.66614.8328.46114.832

Note 1: in the table, the unit of peak displacement is mm, the unit of peak speed is m/s, and the unit of peak acceleration is m/s2.