Active and Passive Earth Pressure Calculation Method for Double-Row Piles considering the Nonlinear Pile Deformation
Figure 11
Field test construction process.
(a) Install steel cage and inclinometer tube |
(b) Install the inclinometer tube |
(c) Excavation of the foundation pit |
(d) The excavation of the foundation pit is completed |