Research Article
Active and Passive Earth Pressure Calculation Method for Double-Row Piles considering the Nonlinear Pile Deformation
Figure 11
Field test construction process.
| (a) Install steel cage and inclinometer tube |
| (b) Install the inclinometer tube |
| (c) Excavation of the foundation pit |
| (d) The excavation of the foundation pit is completed |