Research Article
Study on the Application of Gob-Side Entry Retaining via Roof Cutting under the Condition of a Hard Thick Roof
Figure 2
Failure under traditional gob-side entry: (a) failure of filling body, (b) floor heave, (c) solid coal deformation, and (d) deformation curve of the surrounding rock.
| (a) |
| (b) |
| (c) |
| (d) |