Research Article

Coal Seam Gas Extraction by Integrated Drillings and Punchings from the Floor Roadway considering Hydraulic-Mechanical Coupling Effect

Table 2

Measured results of gas pressure and gas content.

Drilling positionDrilling numberVertical depth of measuring point (m)Measuring point elevation (m)Maximum pressure (MPa)Gas content (m3/t)

50 m inward from the opening of the floor roadwayB1-1904-6540.35.0667
B1-2904-6540.354.7032

100 m inward from the opening of the floor roadwayB2-1906-6560.254.8338
B2-2906-6560.34.1869

150 m inward from the opening of the floor roadwayB3-1909-6590.45.4853
B3-2909-6590.54.733

200 m inward from the opening of the floor roadwayB4-1910-6600.354.8716
B4-2910-6600.35.229

250 m inward from the opening of the floor roadwayB5-1911-6610.35.0219
B5-2911-6610.45.6859

300 m inward from the opening of the floor roadwayB6-1913-6630.454.5965
B6-2913-6630.44.3454

350 m inward from the opening of the floor roadwayB7-1915-6650.35.1005
B7-2915-6650.34.8301

400 m inward from the opening of the floor roadwayB8-1918-6680.45.0038
B8-2918-6680.54.9156

450 m inward from the opening of the floor roadwayB9-1918-6680.35.2622
B9-2918-6680.45.0408

500 m inward from the opening of the floor roadwayB10-1920-6700.35.2569
B10-2920-6700.355.1177