Research Article

Risk Assessment Study on Mechanical Connecting Aisle Construction in the Bohai Mudstone Stratum with High Water Pressure

Table 6

Judgment matrix of personnel management risk indicators.


(0.4, 0.5, 0.6)(0.5, 0.6, 0.7)(0.4, 0.5, 0.6)
(0.3, 0.4, 0.5)(0.4, 0.5, 0.6)(0.3, 0.4, 0.5)
(0.4, 0.5, 0.6)(0.5, 0.6, 0.7)(0.4, 0.5, 0.6)