Research Article
An Innovative Directional Blasting Technique for Coal Mine Exploration and Engineering Testing
Table 3
Results of drilling inspection.
| Hole number | Transverse fissure | Longitudinal fissure | Connectivity rate |
| #4 observation hole | 0.07 m (1 cm) | 0.1~0.5 m | 8% | 0.072 m (2 cm) | 0.72~0.8 m | | 4.03 m (2 cm) | | | #5 observation hole | 0.42 m (1 cm) | | 2% |
|
|