Research Article

Evaluation Method of Water Hazard Control Effect of Coal Seam Floor in Deep Mining: Sequence Verification Evaluation

Table 3

Water pressure test data after grouting transformation of Xujiazhuang limestone aquifer.

No.Hydraulic pressure (MPa)Time (min)Regime flow (L/min)Drilling radius (m)Test length (m)

D-1630390.07525.69
D-2630280.07535.4
D-3730350.07536.98
D-4730520.07538.54