Research Article

Impact of Depressurizing Boreholes on Energy Dissipation in Deep Roadway

Table 2

Simulation schemes for the depressurizing boreholes.

ConstantsOrientationLengthInterspacing
Horizontal boreholes drilled in ribs9 m1.2 m

Simulation schemesIIIIIIIVVVI
2 : 31 : 21 : 41 : 61 : 81 : 10
Diameter400 mm300 mm300 mm300 mm300 mm300 mm
Row spacing600 mm600 mm1200 mm1800 mm2400 mm3600 mm

Note that the simulation results without boreholes were regarded as a reference for comparison.