Research Article

Construction and Application of Mathematical Model of Stable Fracture Development Zone of Roof

Table 2

Calculation results of ordinary high-level drilling.

Solution drillingLag effective angle (°) (m) (m) (m)

5#, 10#32.2028.2623.1015.53
5#, 15#33.4627.8221.5615.34