Research Article
Grouting Treatment and Parameters Optimization in Watery Karst Areas of High Speed Railway Tunnel Based on Comprehensive Geological Forecast: A Case Study
Figure 7
Vertical displacement cloud of the tunnel: (a) no grouting, (b) grout 1 m, (c) grout 3 m, (d) grout 5 m, (e) grout 7 m, and (f) grout 9 m.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |