Research Article
Grouting Treatment and Parameters Optimization in Watery Karst Areas of High Speed Railway Tunnel Based on Comprehensive Geological Forecast: A Case Study
Figure 9
The control indicators of the tunnel: (a) arch top settlement, (b) bottom bulge, and (c) water surge per meter of the tunnel.
(a) |
(b) |
(c) |