Research Article

Grouting Treatment and Parameters Optimization in Watery Karst Areas of High Speed Railway Tunnel Based on Comprehensive Geological Forecast: A Case Study

Figure 9

The control indicators of the tunnel: (a) arch top settlement, (b) bottom bulge, and (c) water surge per meter of the tunnel.
(a)
(b)
(c)