Research Article

Grouting Treatment and Parameters Optimization in Watery Karst Areas of High Speed Railway Tunnel Based on Comprehensive Geological Forecast: A Case Study

Table 3

Water surge per meter of tunnel.

Grouting thickness
(m)
013579

Water surge
(L/(m∙min))
22.145.742.511.711.351.14