Research Article

Grouting Treatment and Parameters Optimization in Watery Karst Areas of High Speed Railway Tunnel Based on Comprehensive Geological Forecast: A Case Study

Table 4

Grouting parameters.

Parameter name

Grouting rangeLengthGrout injection 25 m (including stop wall) Excavation length 20 m (including slurry stop wall),
set aside 5 m as a safety rock pan
Thickness
Diffusion radius of the slurry1.5 m
Final pressure of the grouting3.0~5.0 MPa
Diameter of grouting holesΦ90mm, Φ130 mm
Grouting speed10~90 L/min
Spacing of the final hole≤2.3 m
Grouting technologyCombination of forward segmental grouting, backward segmental grouting, and cluster cuff tube grouting
Number of grouting holes130
Tube of orifice m. Φ108 mm. 6 mm thickness