Research Article

Evaluation of Improving Water Flooding Technology by Volume Fracturing of Water Injection Wells in Complex Fractured Reservoirs: A Case Study of Chang 6 Reservoirs in Huaqing Oilfield, Ordos Basin

Table 3

Fracturing construction parameters of test well group.

Well nameLayerPerforated interval
(m)
Sand quantity
(m3)
Sand ratio
(%)
Displacement
(L/min)
Breaking pressure
(MPa)
Working
Pressure (MPa)
Pump stop pressure
(MPa)
Total liquid volume into the ground (m3)

Y 308-59Chang 62176.0-2184.050.011.78.027.924.720.5531.1
2191.0-2194.0
Y 308-61Chang 61941.0-1949.035.210.76.034.741.220.7571.8
1955.0-1961.0
1974.0-1980.025.112.16.033.639.718.1446.2
Y 306-611Chang 62112.0-2118.040.09.56.037.735.619.3470.6
2137.0-2144.020.09.06.036.034.818.8252.8
2146.0-2152.0
Average32.510.65.834.636.219.3426.4