Research Article

Evaluation of Improving Water Flooding Technology by Volume Fracturing of Water Injection Wells in Complex Fractured Reservoirs: A Case Study of Chang 6 Reservoirs in Huaqing Oilfield, Ordos Basin

Table 4

Production performance of single well before and after volume fracturing test of well cluster Y 306-611.

Production wellTracer breakthrough time
(d)
Tracer peak propulsion velocity
(m/d)
Before testAt presentContrast
Liquid production(m3/d)Oil production(m3/d)Water ratio(%)Liquid production(m3/d)Oil production(m3/d)Water ratio(%)Oil production(m3/d)Water ratio(%)

Y 305-603016.1Shut-in well for high water content6.21.576.01.63-20.7
Y 306-60426.56.10.198.81.201000.11-2.1
Y 306-62348.13.11.159.21.81.329.20.20-30.0
Y 307-61468.54.40.587.71.30.750.00.21-37.7
Y 305-61//1.91.510.02.72.412.00.892.0
Y 305-62//Shut-in well for high water contentShut-in well for high water content//
Y 307-60//3.30.388.51.50.755.60.36-32.8
Y 307-62//2.20.856.21.21.110.60.28-45.7