Abstract
This investigation focused on the three-dimensional (3D) seepage field simulation of an asphaltic concrete core rockfill dam (ACRD) under the design water level conditions. At first, the finite element theory of seepage is introduced in the arid area; then, a hydro-junction projection on the Nuer River in Xinjiang is selected as engineering background, the finite element model of a seepage field of an asphaltic and concrete core rockfill dam under the design water level condition is established, and a boundary condition is determined, and the next distribution of a seepage field of different profiles are plotted, and the monitoring value of different points is compared with the finite element solution; conclusions can be drawn that when the antiseepage system of the dam foundation is good, the water level at the downstream side of the core wall is greatly reduced; for the dam foundation, the effects of reducing head of the cutoff wall are rather obvious, and for the dam body, certain leakage defects at the joint of an impermeable body in the cross sections and can exist. For the dam-around seepage, the hydrogeological condition conforms to the actual conditions. These conclusions can provide great significance for the future design.
1. Introduction
A dam is a water storage construction, and it has many types [1], for example, an embankment dam and a concrete dam, but a core wall dam is applied widely in the world currently [2, 3], because it has many virtues, such as simple construction, good adaptability to dam foundation conditions, good seismic performance, and economy to invest in [4]. For the core wall dam, the distribution of a seepage field is an important issue for the safety of the dam [5].
To monitor the seepage distribution of the core wall dam, many researches have been performed by many researchers [6, 7]. Xu et al. [8] developed a three-dimensional (3D) finite element procedure based on a modified generalized plasticity mode to simulate the construction process; a particle swarm optimization algorithm is introduced by Xiang et al. [9] during the modeling process; the lag effects of water level in osmometers are performed in the investigation. Then, a nonlinear elastic deformation and an unsteady seepage coupling model are suggested to simulate the seepage and deformation process by Chen and Zhang [10]; the Monte Carlo simulation and random field theory are applied to simulate the seepage of an embankment dam by Tan et al. [11]; the seepage behavior in the drainage area of a face sand is investigated by Choo et al. [12]; an inversion of dam seepage parameters based on the finite element model is performed by Ren et al. [13]. But these investigations intend to the wet area, for the distribution of a seepage field in the arid area; the investigation is scarce; the investigation area in the paper is located in Xinjiang Province, China. It is a typical arid area; there is no infiltration in the arid area [14, 15], so a simulation of a 3D seepage field in the arid area becomes an important issue in the paper.
The paper is organized as follows: in Section 2, the finite element method of seepage is introduced at first; in Section 3, the numerical model of specific engineering example is established, and boundary conditions are determined; in Section 4 results and discussion are investigated; in Section 5, conclusions are drawn.
2. The Finite Element Method of Seepage
The permeable mediums including fractured rock mass are regarded as continuous anisotropic mediums in the paper. It is assumed in rock hydraulics for the fractured rock, if fissures are more developed, and representative elementary volume exists, its magnitude is not big enough, and it can be regarded as the groundwater movement [16, 17] and confirms to saturated and stable Darcy seepage law of incompressible flow. They can be expressed as follows: where is the velocity component, is the infiltrate tensor, is the hydraulic gradient, and is the water head.
When Equation (1) is substituted into the continual equation of seepage , it can be expressed as follows [18–20]: where is the steady rainfall infiltration and evaporation capacity.
Its mixed boundary can be expressed as follows: where is the constant.
According to Snow’s theory, it is assumed that the fissures in the rock mass are generalized as the groups; the unit normal vector of fissures in the -th groups is ; the average opening degree is ; when different groups of fissures are all infinite extensive [21], it can be expressed as follows: where is the mean bulk density and is the average equivalent hydraulic gap width; namely, , where is the total number of the -th group of fissures and is the equivalent hydraulic gap width in the th fissure; to consider nonthrough fracture, the fissures are assumed as the circle, and its mean radius is ; infiltration tensor can be obtained as follows according to Equation (5): where is the gravity acceleration, is the coefficient of kinematic viscosity, is the radius of slit disk, is a dimensionless coefficient that reflected the fracture connectivity and number of intersections among different groups of fissures, , when the fissures are nonthrough, ; is the volume density in the -th group of fissures, .
According to Equation (2), the basic equation of three-dimensional seepage of the finite element can be shown as follows:
where is the water pressure of element and is the seepage matrix of element; they can be shown as follows: where is the form function of isoperimetric element in eight nodes in space.
Finally, the whole filtration matrix can be formed from the element filtration matrix as follows [22]:
Initial flow method is adopted to solve the matrix. According to the method, the Darcy law can be revised as follows:
where is the flow rate, is the infiltrate sensor, and is the initial value of flow capacity.
There is no infiltration in the arid area; can be rewritten as follows: where
The value of initial flow can be shown as follows:
Substituting Equation (12) into continual equation of seepage, it can be obtained as follows:
According to the Galerkin method, the whole region is discrete, and the finite element equation can be rewritten as follows [23, 24]: where and are the separately global conduction matrix and equivalent node flow, respectively, is the equivalent node flow derived from initial flow, and can be expressed as follows [25]: where is the geometric matrix of element and is the water head array in the node of element.
3. Engineering Application Example
3.1. Project Overview
The hydropower project under consideration in this investigation is located on the Nuer River. It is a controlled hydro-junction projection. A water diversion power generation system is located on the left bank; spillway and diversion tunnel are located on the right bank. Total capacity of reservoir is 0.69 billion m3, and its normal water storage level is 2497 m; the dead water level is 2465 m; the total installed capacity of power station is 6.2 MW; the average annual generation over many years is 0.217 billion kWh, and the basic information of the dam are shown in Figure 1.

The dam is located in the riverbed; it is an asphaltic concrete core rockfill dam with a maximum height of 80 m. Eolian low liquid limit silt is covered on the upper part of the left bank slope, and its thickness is 30~53 m; Pleistocene alluvial sand and gravel are covered on the lower part of Pleistocene alluvial gravel, and its thickness is approximately 5~6 m; the upper limit of a weak weathering layer of conglomerate in western region is covered with the foundation in the left bank core ( section); the upper limit of a weak weathered layer is covered with the foundation in the left bank core ( section); Pleistocene-Holocene alluvial sand and gravel are covered in the channel core ( section); the Q3al alluvial sand and gravel are covered in the depth of 0~15 m; Q2al alluvial sand and gravel are located in the depth of 15~20 m; the western conglomerate is located beneath the depth of 20 m. Eolian low liquid limit silt is covered on the right bank slope (elevation is greater than 2730 m), and its thickness is 35~45 m; terrace gravel is covered on the right bank (elevation is under 2730 m). According to geological survey and engineering experience, the infiltration coefficients, allowable gradient of different rock layers, and damming material are shown in Table 1.
3.2. The Establishment of the Equivalent Finite Element Model
To establish the model, in dimensions are adopted as a calculative range. It is plotted in Figure 2.

Based on the corresponding data, a three-dimensional seepage model in the hydro-junction area is established in Figure 3. Isotropic finite element of hexahedral eight-node is adopted in the model, and transitional articulation of tetrahedron element is also selected in a certain local area. In total, 55877 elements and 56126 nodes are generated in the model. The top view of the model is plotted in Figure 4.


16 typical profiles are selected to plot a two-dimensional profile of a seepage field; the profiles parallel to the axis of the dam are numbered as 1~6 (they are, respectively, located at downstream of the dam axis: , , , , , and ); the profiles vertical to the axis of the dam are numbered as 7~14 (their pile numbers are, respectively, , , , , , , , and ); the central axis profile of spillway is numbered as 15; the central axis profile of division tunnel is numbered as 16. The specific location of profiles is plotted in Figure 5.

3.3. The Determination of Boundary Condition
The schematic diagram of a boundary condition in the model is plotted in Figure 6. In the model, six boundary conditions are, respectively, set as follows: (1)The cutoff boundary on the left and right banks and the upstream cutoff boundary and bottom boundary are, respectively, assumed as a water-proof boundary; a downstream cutoff boundary is defined as a water level of downstream riverbed(2)The upper boundary condition: the place below water level of the reservoir at the upstream side is set as a given head boundary; the seepage boundary can exist at the place above the water level of the reservoir, so the upstream water level of reservoir is selected as 2470 m; the place below the downstream water level at the downstream side is set as a given head boundary; the seepage boundary can exist at the place above the downstream water level, so the water level of the downstream riverbed section is set as 2413.8 m

4. The Results and Discussion
4.1. The Analysis of a Seepage Field under Design Water Level Conditions
The three-dimensional seepage field is analyzed when antiseepage system and the lining of hydraulic tunnel are both good. The isopotential maps of seepage filed at the typical profile of the dam are, respectively, plotted from Figures 7–16 as follows:










It can be found from Figure 7 to Figure 14 that when the antiseepage system of the dam foundation is good, the water level at the downstream side of the core wall in the dam body is greatly reduced, and the saturation line in the dam body is very low and smooth, and they are basically located in the overburden of the dam foundation; the distribution maps of the seepage field about the overflow and diversion tunnel are, respectively, plotted in Figures 15 and 16. It can be found in Figure 15 that for the spillage tunnel, the tunnel body beyond pile number all is above the groundwater level; it can be found from Figure 16 that for the diversion tunnel, most of the tunnel body is under the groundwater level; the tunnel bodies beyond pile number all are near the groundwater level.
4.2. The Analysis of Monitoring Point about the Seepage Field
4.2.1. The Analysis of Monitoring Data about the Seepage of the Dam Foundation
Content of seepage monitoring in the hydro-junction projection is composed of three parts: seepage monitoring of the dam foundation, seepage monitoring of the dam body, and the dam-around seepage monitoring.
4.2.2. Seepage Monitoring of the Dam Foundation
The osmometers are buried in the dam foundation at the downstream of cross sections and in the cutoff wall. Their elevations are, respectively, 2406.5 m and 2407.5 m.
4.2.3. Seepage Monitoring of the Dam Body
(1) The Seepage Monitoring at the Downstream of Core Base. The osmometers that are buried in the downstream of core base are, respectively, numbered as P1, P10, P11, P3, P12, P13, P6, P14, P8, et al. The distribution map of water level about the seepage pressure of monitoring point along the dam axis is shown in Figure 17; it can be found in Figure 17 that the seepage pressure distribution curve of different monitoring points is basically consistent with the one of a concrete core dam; however, the higher osmotic water level possibly exists in blue circle.

(2) The Seepage Monitoring of the Downstream Dam Body. The distribution maps of seepage pressure on the cross sections and are, respectively, plotted in Figures 18 and 19. It can be found from Figures 18 to 19 that the seepage pressure distribution of different points basically conforms to seepage pressure distribution law. But the distribution of seepage pressure among monitoring points P6 and P5, P3, and P2 is abnormal; the phenomenon can be originated from the leakage defects of joint in the concrete base.


(3) Dam-Around Seepage Monitoring. The monitoring points UP9, UP10, and UP11 are, respectively, buried on the left bank at the distances 13 m, 21 m, and 120 m from the downstream; the monitoring points UP14, UP13, and UP12 are, respectively, buried on the right bank at the distances 6 m, 83 m, and 113 m from the downstream.
4.3. The Comparative Analysis of Seepage Water Level
4.3.1. Seepage Comparison of the Dam Foundation
The monitoring value of seepage pressure at the monitoring points P2 and P5 of the cross sections and along the downstream of cutoff wall is compared with the value of FEM simulation. It is shown in Table 2 that the values of FEM simulation are lower more than 1 m than monitoring value, and it also can be seen that the reduced head of monitoring points arrives at over 77.5% in both methods. The effects of reducing head of the cutoff wall are rather obvious. The whole of cutoff wall is in good case.
4.3.2. Seepage Comparison of the Dam Body
(1) The Seepage Monitoring at the Downstream of Core Base. The monitoring value of seepage pressure along the downstream of core base is compared with the value of FEM simulation. It is shown in Table 3 that the simulation values at monitoring points are lower than actual monitoring value, especially for the monitoring points P6 and P3; they are rather lower and, respectively, reduce 3.45 m and 5.65 m, but the difference of magnitudes of other monitoring points is small; in total, the magnitudes of seepage pressure at the left and right banks are higher, and the ones in the middle pile number are lower; such a distribution law is represented in both methods. The conclusions can be drawn that certain leakage defects at the joint of an impermeable body at the cross sections and can exist by comparison.
(2) The Seepage Monitoring of the Downstream Dam Body. The monitoring value of seepage pressure at the cross sections and is, respectively, compared with the value of FEM simulation. It is shown in Table 4 that the simulation values are lower than the actual monitoring value; the magnitudes of seepage pressure at the cross section are reduced by 1.0 m~2.0 m; ones at the cross section are reduced by 4.0 m~5.0 m; a common issue is faced: the water levels of seepage pressure at the depth of the dam foundation at the downstream side of the cutoff wall are lower than the ones of foundation surface; this phenomenon does not confirm to the basic law of porous medium, so conclusions can be drawn that there exists a leakage defect at the joint of an impermeable body at 2420 m.
4.3.3. The Comparison of the Dam-Around Seepage Monitoring
The monitoring value of the dam-around seepage at the left and right banks is compared with the value of FEM simulation. It is shown in Table 5 that the monitoring values of monitoring points UP10 and UP11 at the left bank are, respectively, higher (6.0 m and 7.24 m) than simulation value, because their distance from the axis line is far; the extravasation of water in the spillway tunnel results from the higher monitoring value. The monitoring value at the right bank is very close to the simulation value; the difference is less than 2 m. These demonstrate that the hydrogeological condition conforms to the actual conditions.
5. Conclusions
(1)When the antiseepage system of the dam foundation is good, the water level on the downstream side in the dam body is greatly reduced(2)The seepage field of the dam body and foundation from FEM simulation is basically consistent with the monitoring results; the water level of seepage pressure is basically lower than the monitoring water level, especially for the cross sections and ; their reduced magnitude is more, so the conclusions can be drawn that certain leakage defects at the joint of an impermeable body at the cross sections and can exist(3)The seepage pressure of bottom monitoring points is lower than one of the dam foundation at the cross sections and in the dam section; it can be concluded that there exists a leakage defect at the joint of an impermeable body at the height 2420 m(4)The calculation and analysis of the dam-around seepage at the left and right banks demonstrate that magnitudes of monitoring points UP10 and UP11 at the left bank are higher; the extravasation of water in the spillway tunnel can be a direct factor; the monitoring value at the right bank is very close to the simulation value; these demonstrate that the hydrogeological condition conforms to the actual conditions of projection
Data Availability
The data used to support the findings of this study are available from the corresponding author upon request.
Conflicts of Interest
The authors declare that they have no conflicts of interest.
Acknowledgments
This work is supported by the first batch of Natural Science Foundation of Sichuan Provincial Department of Education (no. 17ZA0270), the cross project in Nanyang Institute of Technology (230067), and the general scientific research project of Zhejiang Provincial Department of Education (Y201839661).