Research Article

Numerical Simulation of a 3D Seepage Field of an Asphaltic and Concrete Core Rockfill Dam in an Arid Area

Table 4

The comparison of seepage pressure at downstream dam body.

The number of monitoring pointThe buried siteMonitoring valueThe simulation valueThe error
Pile number (m)Distance from upstream wall (m)Elevation (m)

P202406.5002420.7042419.42-1.28
P302420.0002421.602419.22-2.38
UP232419.8992421.782419.15-2.62
UP3402417.1442421.322418.89-2.43
UP4802414.0002420.242418.73-1.51
P41202420.0002420.422418.51-1.91
P502407.5002421.3072420.17-1.13
P602420.0002425.7732420.13-5.65
UP532418.7022425.352420.12-5.23
UP6402415.0492424.422419.91-4.51
UP7802413.8682424.212419.55-4.66
P71202420.0002422.502418.98-3.52