Erosion Effect on Non-Darcy Hydraulic Characteristics of Limestone and Mudstone Mixture
Procedure 2
Water pressure loading: the oil pump is started, and water is injected into the erosion unit, the data from the electronic scales in the particle collection system and the data measured by the acquisition system and are monitored.