Research Article

An Improved Coupled Modeling Method for Coalbed Methane Extraction after Hydraulic Fracturing

Figure 17

Gas pressure and cumulative production before and after fracturing: (a) gas pressure of line AB and (b) cumulative production of coalbed methane.
(a)
(b)