Research Article

Performance of a Subgrade-Embankment-Seawall System Reinforced by Drainage PCC Piles and Ordinary Piles Subjected to Lateral Spreading

Table 6

Peak excess pore water pressure ratio ().

Measure pointP1P2P3P4P5P6P7P8P9

Case 10.240.140.270.240.280.220.800.530.55
Case 20.330.300.270.540.470.390.940.600.70