Research Article
Layout and Parameter Analysis of the Cooling System with Mine Water as Cold Source in Linglong Gold Mine
Table 2
Cooling load calculation results.
| | Inlet air volume (m/s) | Mechanical equipment power (kW) | Heat load of mechanical equipment (kW) | Sensible heat load of surrounding rock and ponding (kW) | Latent heat load of surrounding rock and ponding (kW) | Total heat load (kW) | Cooling load (kW) |
| Stope ① and heading face ① | 1.03 | 30.00 | 12.05 | 11.74 | 28.14 | 51.93 | 76.80 | Stope ② and heading face ② | 1.14 | 45.00 | 18.05 | 11.74 | 28.14 | 57.93 | 85.68 | Total | | | | | | 219.72 | 325.00 |
|
|