Research Article

[Retracted] Application of Isotope Tracer in Cross-Well Nanometre Tracer Testing

Table 4

Dynamic monitoring of well cluster J1.

TracerCorresponding wellDistance between oil and water wells (m)Tracer breakthrough time (d)Leading edge waterline propulsion speed ()Injection water ratio (%)Injection water distribution ()Actual water production ()

522.12774.5945.055.862.80
300.781915.836.380.831.00
309.281619.337.150.930.76
387.621329.828.211.070.29

703.157100.4520.200.340.35
295.221224.2615.642.661.79
513.254012.8320.313.451.31
790.934716.486.901.170.98