Research Article
[Retracted] Application of Isotope Tracer in Cross-Well Nanometre Tracer Testing
Table 4
Dynamic monitoring of well cluster J1.
| Tracer | Corresponding well | Distance between oil and water wells (m) | Tracer breakthrough time (d) | Leading edge waterline propulsion speed () | Injection water ratio (%) | Injection water distribution () | Actual water production () |
| | | 522.12 | 7 | 74.59 | 45.05 | 5.86 | 2.80 | | 300.78 | 19 | 15.83 | 6.38 | 0.83 | 1.00 | | 309.28 | 16 | 19.33 | 7.15 | 0.93 | 0.76 | | 387.62 | 13 | 29.82 | 8.21 | 1.07 | 0.29 |
| | | 703.15 | 7 | 100.45 | 20.20 | 0.34 | 0.35 | | 295.22 | 12 | 24.26 | 15.64 | 2.66 | 1.79 | | 513.25 | 40 | 12.83 | 20.31 | 3.45 | 1.31 | | 790.93 | 47 | 16.48 | 6.90 | 1.17 | 0.98 |
|
|