Research Article
Efficient Variable Thickness Radome Design with Insertion Phase Delay Correction
Table 5
Effect of side selection and modification factor.
| | BSEmax (mrad) | TLmax (dB) | Number of EM computations |
| Efficient design—proposed | 0.706 | 0.53 | 237 | One-side-correction only | 0.918 | 0.52 | 149 | No modification factor | 0.972 | 0.50 | 651 |
|
|