Research Article
A FJSSP Method Based on Dynamic Multi-Objective Squirrel Search Algorithm
Figure 17
Comparison of deviations between old and new scheduling schemes during machine failure and failure recovery. (a) M2 failure. (b) M5 failure. (c) M6 failure.
| (a) |
| (b) |
| (c) |