Research Article
A FJSSP Method Based on Dynamic Multi-Objective Squirrel Search Algorithm
Figure 17
Comparison of deviations between old and new scheduling schemes during machine failure and failure recovery. (a) M2 failure. (b) M5 failure. (c) M6 failure.
(a) |
(b) |
(c) |