Research Article

A FJSSP Method Based on Dynamic Multi-Objective Squirrel Search Algorithm

Figure 17

Comparison of deviations between old and new scheduling schemes during machine failure and failure recovery. (a) M2 failure. (b) M5 failure. (c) M6 failure.
(a)
(b)
(c)