Research Article
A Weak-Coupling Flow-Power Forecasting Method for Small Hydropower Station Group
Figure 10
24-hour-ahead runoff prediction curves. (a) Prediction curve for basin 11. (b) prediction curve for basin 326. (c) prediction curve for basin 491, and (d) prediction curve for basin 525.
(a) |
(b) |
(c) |
(d) |