Research Article

A Weak-Coupling Flow-Power Forecasting Method for Small Hydropower Station Group

Figure 10

24-hour-ahead runoff prediction curves. (a) Prediction curve for basin 11. (b) prediction curve for basin 326. (c) prediction curve for basin 491, and (d) prediction curve for basin 525.
(a)
(b)
(c)
(d)