Research Article
A Weak-Coupling Flow-Power Forecasting Method for Small Hydropower Station Group
Figure 14
24-hour prediction results without precipitation variable at time . (a) Plot of the attention weight vector (, 4,…,24), (b) plot of the total evapotranspiration variables input to the TFT model, and (c) 24-hour-ahead power prediction curve.
(a) |
(b) |
(c) |